Skip to main content
All counties

Bomet County — FY 2026/27

Sign in to follow
Equitable share
KES 7.69B
Baseline (held harmless)
KES 7.02B
Fourth Basis top-up
KES 675.08M
Marginalisation top-up
Not eligible

Ranked #30 of 47 · -8.4% vs median (KES 8.39B). Share +1.9% YoY (+KES 144.23M vs FY 2024/25). Programme lines may be interim until assembly estimates load.

Approved FY 2025/26 programme based budget (KIPPRA repository).

Official vs FedhAI reference

Sector share comparison. Efficiency 56.0% · C+. How we score.

SectorOfficial shareFedhAI reference shareGap (points)
Health27.0%22.1%-5.0 pts
Education4.9%18.0%+13.1 pts
Infrastructure7.2%14.0%+6.8 pts
Agriculture5.2%12.0%+6.7 pts
Administration33.9%8.0%-26.0 pts
Water & Sanitation10.6%8.0%-2.7 pts
Social Protection0.5%5.0%+4.4 pts
Security—5.0%—
Recurrent — County Assembly—4.0%—
Recurrent — County Executive—4.0%—
Recurrent G�� County Assembly9.1%0.1%-9.0 pts
Recurrent G�� County Executive1.4%0.1%-1.3 pts

Official allocation (detail)

Lines exactly as the office published them. The note column cites the source document, not the FedhAI reference.

Line itemAmountShareNote
AdministrationAdministration FY 2025/26 approved department/vote summaryKES 3.09B33.9%bomet approved PBB FY 2025/26 extractMode=bomet_table3_sector G�� KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/4560f3b9-6cec-4afa-b37c-9f3624a4f813/content
HealthHealth FY 2025/26 approved department/vote summaryKES 2.46B27.0%bomet approved PBB FY 2025/26 extractMode=bomet_table3_sector G�� KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/4560f3b9-6cec-4afa-b37c-9f3624a4f813/content
Water & SanitationWater & Sanitation FY 2025/26 approved department/vote summaryKES 969.05M10.6%bomet approved PBB FY 2025/26 extractMode=bomet_table3_sector G�� KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/4560f3b9-6cec-4afa-b37c-9f3624a4f813/content
Recurrent G�� County AssemblyRecurrent G�� County Assembly FY 2025/26 approved department/vote summaryKES 829.98M9.1%bomet approved PBB FY 2025/26 extractMode=bomet_table3_sector G�� KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/4560f3b9-6cec-4afa-b37c-9f3624a4f813/content
InfrastructureInfrastructure FY 2025/26 approved department/vote summaryKES 658.15M7.2%bomet approved PBB FY 2025/26 extractMode=bomet_table3_sector G�� KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/4560f3b9-6cec-4afa-b37c-9f3624a4f813/content
AgricultureAgriculture FY 2025/26 approved department/vote summaryKES 475.59M5.2%bomet approved PBB FY 2025/26 extractMode=bomet_table3_sector G�� KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/4560f3b9-6cec-4afa-b37c-9f3624a4f813/content
EducationEducation FY 2025/26 approved department/vote summaryKES 446.46M4.9%bomet approved PBB FY 2025/26 extractMode=bomet_table3_sector G�� KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/4560f3b9-6cec-4afa-b37c-9f3624a4f813/content
Recurrent G�� County ExecutiveRecurrent G�� County Executive FY 2025/26 approved department/vote summaryKES 131.00M1.4%bomet approved PBB FY 2025/26 extractMode=bomet_table3_sector G�� KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/4560f3b9-6cec-4afa-b37c-9f3624a4f813/content
Social ProtectionSocial Protection FY 2025/26 approved department/vote summaryKES 47.85M0.5%bomet approved PBB FY 2025/26 extractMode=bomet_table3_sector G�� KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/4560f3b9-6cec-4afa-b37c-9f3624a4f813/content

The FedhAI reference line is an independent benchmark for the same enacted total — not a copy of the official book. How we score.

Approved programme budget document (FY 2025/26)

The full document approved by the Bomet County Assembly, opened from the KIPPRA repository. FedhAI does not keep its own copy, so you always see the publisher's version.

Open the budget document

The table above is a summary. A line-by-line listing appears here once the county office supplies the budget as a CSV or spreadsheet.

Projects on this budget

Status and spending are reported by the owning office. FedhAI does not guess a status: if an office has not updated a project for 90 days, the page says so.

Bomet County, FY 2026/27

Same issue merges into one thread. Up to five new threads per hour.

Live

A funded project is late, stalled or unfinished.

Title needs 8+ characters and the detail field 15+. The post button stays available.

Screened for spam and off-topic content before publishing.

Sign in to publish. The form stays active so you can draft first.

Loading threads…

NGAAF · Bomet

Woman Rep county scope — not MP constituencies. About NGAAF

Allocation & programmes

Loading signals…

    Threads

    Same issue merges into one thread. Up to five new threads per hour.

    Live

    A NGAAF project is late, stalled or unfinished.

    Title needs 8+ characters and the detail field 15+. The post button stays available.

    Screened for spam and off-topic content before publishing.

    Sign in to publish. The form stays active so you can draft first.

    Loading threads…