Skip to main content
All counties

Kitui County — FY 2026/27

Sign in to follow
Equitable share
KES 11.85B
Baseline (held harmless)
KES 10.89B
Fourth Basis top-up
KES 965.47M
Affirmative action
Not eligible

Ranked #9 of 47 by equitable share — +41.2% versus the county median of KES 8.39B. Enacted share changed +1.4% YoY (+KES 160.22M vs FY 2024/25). Programme lines below may be interim (CoB sector template on enacted share) until county assembly estimates replace them.

Approved FY 2025/26 programme based budget (KIPPRA repository).

Official vs FedhAI reference

Share of the budget each sector receives, side by side. The reference is a FedhAI working allocation built independently of this office's lines; only its sector shares are public. Efficiency 68.3% · B. How we score.

SectorOfficial shareFedhAI reference shareGap (points)
Health28.7%22.1%-6.5 pts
Education7.3%18.0%+10.8 pts
Infrastructure15.4%14.0%-1.4 pts
Agriculture—12.0%—
Administration24.0%8.0%-16.0 pts
Water & Sanitation10.9%8.0%-2.9 pts
Social Protection6.1%5.0%-1.1 pts
Security—5.0%—
Recurrent — County Assembly7.7%4.0%-3.7 pts
Recurrent — County Executive—4.0%—

Official allocation (detail)

Lines exactly as the office published them. The note column cites the source document, not the FedhAI reference.

Line itemAmountShareNote
HealthHealth FY 2025/26 approved department/vote summaryKES 4.31B28.7%kitui approved PBB FY 2025/26 extractMode=kitui_vote_programme_summary — KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/11fc30e5-c9ab-4b3b-b2f2-f1ba53e8bab3/content
AdministrationAdministration FY 2025/26 approved department/vote summaryKES 3.61B24.0%kitui approved PBB FY 2025/26 extractMode=kitui_vote_programme_summary — KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/11fc30e5-c9ab-4b3b-b2f2-f1ba53e8bab3/content
InfrastructureInfrastructure FY 2025/26 approved department/vote summaryKES 2.33B15.4%kitui approved PBB FY 2025/26 extractMode=kitui_vote_programme_summary — KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/11fc30e5-c9ab-4b3b-b2f2-f1ba53e8bab3/content
Water & SanitationWater & Sanitation FY 2025/26 approved department/vote summaryKES 1.64B10.9%kitui approved PBB FY 2025/26 extractMode=kitui_vote_programme_summary — KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/11fc30e5-c9ab-4b3b-b2f2-f1ba53e8bab3/content
Recurrent — County AssemblyRecurrent — County Assembly FY 2025/26 approved department/vote summaryKES 1.16B7.7%kitui approved PBB FY 2025/26 extractMode=kitui_vote_programme_summary — KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/11fc30e5-c9ab-4b3b-b2f2-f1ba53e8bab3/content
EducationEducation FY 2025/26 approved department/vote summaryKES 1.10B7.3%kitui approved PBB FY 2025/26 extractMode=kitui_vote_programme_summary — KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/11fc30e5-c9ab-4b3b-b2f2-f1ba53e8bab3/content
Social ProtectionSocial Protection FY 2025/26 approved department/vote summaryKES 911.77M6.1%kitui approved PBB FY 2025/26 extractMode=kitui_vote_programme_summary — KIPPRA repository https://repository.kippra.or.ke/server/api/core/bitstreams/11fc30e5-c9ab-4b3b-b2f2-f1ba53e8bab3/content

The FedhAI reference line is an independent benchmark for the same enacted total — not a copy of the official book. How we score.

Approved programme budget document (FY 2025/26)

The full document approved by the Kitui County Assembly, opened from the KIPPRA repository. FedhAI does not keep its own copy, so you always see the publisher's version.

Open the budget document

The table above is a summary. A line-by-line listing appears here once the county office supplies the budget as a CSV or spreadsheet.

Projects on this budget

Status and spending are reported by the owning office. FedhAI does not guess a status: if an office has not updated a project for 90 days, the page says so.

Citizen participation — Kitui County, FY 2026/27

Public questions on this budget. Same-issue posts join one ticket. Private mail goes to the office address — we do not keep a copy. Five new tickets per hour.

This budget is approved. Report how it is being implemented: delays, misappropriation, projects that are missing or not delivered.

Live

A funded project is late, stalled or unfinished.

Title needs 8+ characters and the detail field 15+. The post button stays available.

Screened for spam and off-topic content before publishing.

Sign in to publish. The form stays active so you can draft first.

Loading threads…