Skip to main content
All counties

Wajir County — FY 2026/27

Sign in to follow
Equitable share
KES 10.85B
Baseline (held harmless)
KES 9.90B
Fourth Basis top-up
KES 944.91M
Affirmative action
Not eligible

Ranked #11 of 47 by equitable share — +29.3% versus the county median of KES 8.39B. Enacted share changed +2.3% YoY (+KES 243.74M vs FY 2024/25). Programme lines below may be interim (CoB sector template on enacted share) until county assembly estimates replace them.

Approved FY 2025/26 programme based budget (KIPPRA repository).

Official vs FedhAI reference

Share of the budget each sector receives, side by side. The reference is a FedhAI working allocation built independently of this office's lines; only its sector shares are public. Efficiency 70.2% · B+. How we score.

SectorOfficial shareFedhAI reference shareGap (points)
Health26.2%22.1%-4.1 pts
Education9.5%18.0%+8.5 pts
Infrastructure14.8%14.0%-0.8 pts
Agriculture4.8%12.0%+7.2 pts
Administration15.8%8.0%-7.9 pts
Water & Sanitation15.0%8.0%-7.0 pts
Social Protection3.8%5.0%+1.1 pts
Security—5.0%—
Recurrent — County Assembly—4.0%—
Recurrent — County Executive—4.0%—
Recurrent ΓÇö County Assembly6.6%0.1%-6.5 pts
Recurrent ΓÇö County Executive3.6%0.1%-3.5 pts

Official allocation (detail)

Lines exactly as the office published them. The note column cites the source document, not the FedhAI reference.

Line itemAmountShareNote
HealthHealth FY 2025/26 approved department/vote summaryKES 3.66B26.2%wajir approved PBB FY 2025/26 Table 3a/3b vote and category summary ΓÇö KIPPRA repository
AdministrationAdministration FY 2025/26 approved department/vote summaryKES 2.22B15.8%wajir approved PBB FY 2025/26 Table 3a/3b vote and category summary ΓÇö KIPPRA repository
Water & SanitationWater & Sanitation FY 2025/26 approved department/vote summaryKES 2.09B15.0%wajir approved PBB FY 2025/26 Table 3a/3b vote and category summary ΓÇö KIPPRA repository
InfrastructureInfrastructure FY 2025/26 approved department/vote summaryKES 2.07B14.8%wajir approved PBB FY 2025/26 Table 3a/3b vote and category summary ΓÇö KIPPRA repository
EducationEducation FY 2025/26 approved department/vote summaryKES 1.33B9.5%wajir approved PBB FY 2025/26 Table 3a/3b vote and category summary ΓÇö KIPPRA repository
Recurrent ΓÇö County AssemblyRecurrent ΓÇö County Assembly FY 2025/26 approved department/vote summaryKES 918.78M6.6%wajir approved PBB FY 2025/26 Table 3a/3b vote and category summary ΓÇö KIPPRA repository
AgricultureAgriculture FY 2025/26 approved department/vote summaryKES 665.74M4.8%wajir approved PBB FY 2025/26 Table 3a/3b vote and category summary ΓÇö KIPPRA repository
Social ProtectionSocial Protection FY 2025/26 approved department/vote summaryKES 537.72M3.8%wajir approved PBB FY 2025/26 Table 3a/3b vote and category summary ΓÇö KIPPRA repository
Recurrent ΓÇö County ExecutiveRecurrent ΓÇö County Executive FY 2025/26 approved department/vote summaryKES 501.61M3.6%wajir approved PBB FY 2025/26 Table 3a/3b vote and category summary ΓÇö KIPPRA repository

The FedhAI reference line is an independent benchmark for the same enacted total — not a copy of the official book. How we score.

Approved programme budget document (FY 2025/26)

The full document approved by the Wajir County Assembly, opened from the KIPPRA repository. FedhAI does not keep its own copy, so you always see the publisher's version.

Open the budget document

The table above is a summary. A line-by-line listing appears here once the county office supplies the budget as a CSV or spreadsheet.

Projects on this budget

Status and spending are reported by the owning office. FedhAI does not guess a status: if an office has not updated a project for 90 days, the page says so.

Citizen participation — Wajir County, FY 2026/27

Public questions on this budget. Same-issue posts join one ticket. Private mail goes to the office address — we do not keep a copy. Five new tickets per hour.

This budget is approved. Report how it is being implemented: delays, misappropriation, projects that are missing or not delivered.

Live

A funded project is late, stalled or unfinished.

Title needs 8+ characters and the detail field 15+. The post button stays available.

Screened for spam and off-topic content before publishing.

Sign in to publish. The form stays active so you can draft first.

Loading threads…